Warehouses & fulfillment
AGV/AMR robots for warehouses, fulfilment and distribution centers: picking, zone-to-zone movement, inventory, WMS integration. Scales from a pilot of a few units to dozens — we start on a small area and expand.
- Where it fits
- Warehouses · fulfilmentWarehouses · fulfilment · DCs
- Start
- From 3 AGV/AMR
- Integration speed
- Low
- Cycle to launch
- From 2 months
CAM·01 · SERVICE FLOOR23.13°N · 113.26°E · GUANGZHOUSRV-FLEET · REV.2026
Where this package actually helps
Four typical challenges in this segment — and what changes on the client side once the package is in place.
- Challenges · 01
On many warehouses, payroll and related costs are one of the key operating-expense lines. As wages rise and qualified staff is harder to find, this line grows faster than revenue.
Solutions · 01We move 40—60% of routine moves and picking onto AGVs. Payroll savings become predictable and stop tracking wage inflation — and you can start with a pilot on a small area.
- Challenges · 02
Staff turnover and picking errors. Every shift is a quality loss point and time stolen on rechecks.
Solutions · 02We remove the human factor from 60—80% of picking: AGVs run typical routes with repeatable precision. Errors and losses drop systemically.
- Challenges · 03
Productivity ceiling on manual operations. Scaling the business hits the hiring funnel, which takes months.
Solutions · 03We close the manual-ops ceiling without hiring. Add units or throughput per the seasonal plan in days — not months of recruitment and training.
- Challenges · 04
Peak loads — Black Friday, season, promos. Finding skilled temporary staff is hard and expensive.
Solutions · 04We restore peak-time stability: the same fleet covers baseline and seasonal spikes — no overtime, no rush hiring.
REV.2026 · NODE GZ-01
What it looks like in practice
Two illustrative scenarios — the order of investment, timeline and effect. Figures are indicative; a precise estimate for your site is in the calculator below.
FRAME · 01Inputs
~1,500 m² warehouse, 800–1,200 orders/day, manual picking, peak-season dips.
What we deploy
- 5 AMR (goods-to-person)
- Warehouse mapping
- Basic WMS integration
On-site launch
≈ 6 weeks
Effect & payback
Picker travel −60–70%, picking throughput ≈×2. Payback ≈ 14–20 mo.
FRAME · 02Inputs
~4,000 m² warehouse, pallet moves between shops, shortage of forklift drivers.
What we deploy
- 6 AGV (pallet tuggers)
- Charging stations
- Route dispatching
On-site launch
≈ 10 weeks
Effect & payback
People off the movement routes, running 2–3 shifts. Payback ≈ 18–24 mo.
REV.2026 · SAMPLE 2/2
What's in the package
A ready-made configuration for the task — no separate sourcing and no grey areas of accountability: equipment, integration, training and service at launch assembled as one system.
M·01AGV/AMR robots for the task
RACK TRANSPORT · UP TO 1,000 KG
M·02Warehouse mapping
LIDAR MAP · ROUTES · ZONES
M·03WMS integration
TASK EXCHANGE · API · REAL-TIME
AGV/AMR robots for the task
Geek+, Quicktron and others for the task: picking, pallet movement, inventory. Start with a pilot of a few units and scale.
Warehouse mapping
Marker installation, route layout, work zone and charging station definition. Done on-site in 1—2 days.
WMS integration
Standard connectors for SAP, Manhattan, 1C, Logistic Vision. Custom integrations via API or CSV.
Operator training
Two-day course for operators and shift lead. Russian / English video manuals, maintenance protocols.
Service for the first 3 months
Included in the package: scheduled maintenance, engineering support, consumables. Then — a separate service contract.
- M·01
AGV/AMR robots for the task
Geek+, Quicktron and others for the task: picking, pallet movement, inventory. Start with a pilot of a few units and scale.
- M·02
Warehouse mapping
Marker installation, route layout, work zone and charging station definition. Done on-site in 1—2 days.
- M·03
WMS integration
Standard connectors for SAP, Manhattan, 1C, Logistic Vision. Custom integrations via API or CSV.
- M·04
Operator training
Two-day course for operators and shift lead. Russian / English video manuals, maintenance protocols.
- M·05
Service for the first 3 months
Included in the package: scheduled maintenance, engineering support, consumables. Then — a separate service contract.
REV.2026 · 05 MODULES
How rollout runs
From kickoff to handover — five linear stages. Each one delivers a concrete output, names the accountable side, and has a stated duration. Total budget, exact dates and the risk register are locked in the contract.
- 01/051—2 weeks
Site audit
Floor-plan survey, operations analysis, integration requirements capture. Included in the contract package — not billed separately.
Lead · Nexum CN · engineering team
▣ Stage deliverableTechnical report + 3 configuration options with indicative budget
- 02/054—6 weeks
Sourcing and procurement
Configuration alignment, OEM batch procurement, physical acceptance at the factory before shipment.
Lead · Nexum CN + OEM engineers
▣ Stage deliverableFAT report PDF + serial numbers of the full batch
- 03/052—4 weeks
Logistics and customs
Sea or air freight from Shenzhen to the client's site, customs clearance in the importing country.
Lead · Logistics operator + Nexum
▣ Stage deliverablePacking list + commercial invoice + units on the client's warehouse
- 04/051—2 weeks
Installation and mapping
Charging station installation, route deployment, test run with real operations.
Lead · Nexum field engineers on-site
▣ Stage deliverableDeployed routes on the warehouse + test-run log
- 05/051 week
Training and go-live
Staff training, controlled go-live, gradual ramp-up to full load.
Lead · Nexum + client-side owner
▣ Stage deliverableCertified client operators + acceptance protocol
REV.2026 · 05 STAGES
The same class of AGV solution already powers the largest warehouses in China
Our job is to open access to the same class of equipment and integration for a warehouse of your size, with local service.
JD.com
- Scale
- Jinan · 100 000 m²
- Robots
- 300+ Geek+ AGV
Per public integrator data — order-of-magnitude picking acceleration and significant manual-labour reduction on this class of AGV deployments.
Cainiao (Alibaba)
- Scale
- Wuxi · 50 000 m²
- Robots
- 200+ Quicktron
Per public data — order-of-magnitude reduction in order-assembly time after AGV fleet rollout.
Mengniu Dairy
- Scale
- Inner Mongolia · 30 000 m²
- Robots
- 120 AGV
Solution scaled across typical inter-zone movement operations. Specific operational figures — per integrator data.
Manufacturer reference cases from public sources and industry reviews. Specific figures depend on the site and are confirmed by a calculation after audit.
REV.2026 · REF 3/3
Payback on your inputs
Enter your inputs — get an estimated payback period. Final proposal is prepared after a short audit.
Your inputs
Effective AGV operating zone
Movements and picking combined
Average per month, USD
Result
- Package cost (estimate)
- 6 ×$175,000
- Annual saving
- $98,000
- Payback period
- 1.8 yr
Indicative calculation. In Simple mode it captures direct labour-cost effect; Advanced additionally adds error losses, revenue uplift and operational effects. A full proposal is prepared after a short audit of your site.
Numbers locked in
Save this scenario — we'll prepare a proposal
We tailor a commercial proposal to your site and reply within one business day, in your timezone.
REV.2026 · CALC LIVE
Request a quote for the “Warehouses & fulfillment” package
Initial response — usually within one business day. Preliminary configuration and budget — after we clarify the site parameters.
REV.2026 · INTAKE